Etd

An evaluation of Calvary Bible Church, Lewistown, PA, using 'The Self-Guided Church Consultant'

上市 Deposited
Default work thumbnail

MLA citation style (9th ed.)

Howard D Houtz. An Evaluation of Calvary Bible Church, Lewistown, Pa, Using 'the Self-guided Church Consultant'. Dallas Theological Seminary. rim.ir.atla.com/concern/etds/a0f5e224-10fd-4979-af1d-30903ea7674f?locale=zh.

APA citation style (7th ed.)

H. D. Houtz. An evaluation of Calvary Bible Church, Lewistown, PA, using 'The Self-Guided Church Consultant'. https://rim.ir.atla.com/concern/etds/a0f5e224-10fd-4979-af1d-30903ea7674f?locale=zh

Chicago citation style (CMOS 17, author-date)

Howard D Houtz. An Evaluation of Calvary Bible Church, Lewistown, Pa, Using 'the Self-Guided Church Consultant'. Dallas Theological Seminary. https://rim.ir.atla.com/concern/etds/a0f5e224-10fd-4979-af1d-30903ea7674f?locale=zh.

Note: These citations are programmatically generated and may be incomplete.

造物主
关键词
权利声明
抽象的
  • This study will evaluate Calvary Bible Church of Lewistown, Pennsylvania. The congregation voted to relocate its entire ministry and this study will document the need for the expansion project. This evaluation will analyze the functionality of the future facility, the number of personnel currently involved in ministries at the church, the financial considerations given to a project of this magnitude, and the time involvement of the volunteer force of Calvary Bible Church. The new facility was intentionally designed to double the present facility's capacity. Our new facility will exceed the present occupancy needs and that the church finances will be seen as a contributing factor in the future ministry of the church. The author used 'The Self-Guided Church Consultant' as a method of study. This research brings a conclusion that our new facility was designed properly to meet the needs of a growing church, and the church finances have been restricted.
出版商
主题
语言
资源类型
类型
程度
学位授予机构
顾问
机构
最后修改
  • 02/17/2024

关系

项目