Etd
Developing a Revitalization Strategy for Clinton Baptist Association in East Tennessee
Público Deposited
MLA citation style (9th ed.)
Developing a Revitalization Strategy for Clinton Baptist Association In East Tennessee. rim.ir.atla.com/concern/etds/0b1437b7-0287-4c79-b65b-66497f595b32?locale=pt-BR.APA citation style (7th ed.)
Developing a Revitalization Strategy for Clinton Baptist Association in East Tennessee. https://rim.ir.atla.com/concern/etds/0b1437b7-0287-4c79-b65b-66497f595b32?locale=pt-BRChicago citation style (CMOS 17, author-date)
Developing a Revitalization Strategy for Clinton Baptist Association In East Tennessee. https://rim.ir.atla.com/concern/etds/0b1437b7-0287-4c79-b65b-66497f595b32?locale=pt-BR.Note: These citations are programmatically generated and may be incomplete.
- O Criador
- Declaração de Direitos
- Abstrato
- The purpose of this project is to develop a revitalization strategy for the Clinton Baptist Association in East Tennessee. The project is derived from the strategic planning model. After conducting sufficient research, the project director will learn best practices in field revitalization. The project director will conduct a demographic study to verify the need of revitalizing the association. An internal demographic study will produce the facts and trends of the churches affiliated with the association. An external demographic study of the cities and communities of Anderson County, Tennessee, will be completed to increase awareness of community and generational needs and desires. The project director will assemble a strategic leadership team from the leaders of the associational churches. When assembled, the team will prepare and adopt a strategic planning process and develop a revitalization strategy. After the strategic planning process is created, the final step of the project will be a presentation of the proposed revitalization strategy to the messengers of the annual meeting, followed by the messengers’ vote on the proposal. The implementation of the revitalization strategy will begin in the project and will be completed after the approval of the project. The strategy implementation is outside the scope of the project.
- Ano
- Assunto
- Location
- Linguagem
- Tipo de recurso
- Tipo
- Grau
- Instituição que concede diploma
- Orientador
- Instituição
- Última modificação
- 02/16/2024
Relações
Itens
Não há itens disponíveis publicamente neste Etd.